All basic map features on the top floor is complete. Focusing now on the bottom floor and main lobby. Spent a few days to design and detail the cafeteria and kitchen rooms.
- Elevator is now operational with sound effects.
- Redid the lobby floor texture to resemble a more professional office building tile floor.
- Finished the men and woman's bathrooms for the main lobby. Lighting still needs to be added.
Bugs:
- Lighting is piercing through cracks where the brushes connect in some areas of the map. Will go back to add lighting block brushes later on to correct this.
Thursday, December 3, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment